Florida septic upgrade grants: who pays and how much
November 20, 2026
Florida's statewide Septic Upgrade Incentive Program, run by the Department of Environmental Protection, is no longer taking new applications because its money ran out. DEP says it's working with nine counties to set up their own programs: Citrus, Hernando, Leon, Marion, Orange, Pasco, Seminole, Volusia and Wakulla.
All of these programs pay toward one thing: turning a conventional septic system into a nitrogen-reducing one, and only for homes inside a mapped springs protection area (a Priority Focus Area or BMAP area). They won't pay to swap a failed conventional system for another conventional one.
County by county
What each county's own page said when we checked it. Funding runs out, so confirm before you plan around it.
| County | Up to | Where | Status when checked |
|---|---|---|---|
| Seminole | $10,000 | Wekiwa/Rock Springs Priority Focus Area, unincorporated county | Open, first come first served until its $2.2 million DEP grant is used |
| Orange | $10,000 | Priority Focus Area near Wekiwa and Rock Springs, Orange County Utilities area | Program FAQ published; systems installed on or after November 1, 2020 can qualify |
| Pasco | $10,000 | Spring Hill area (Weeki Wachee BMAP) | Contact the county to apply |
| Leon | $7,500 | Wakulla Springs PFA | Open until its $2.22 million grant is used |
| Hernando | $7,500 | Weeki Wachee Springs Priority Focus Area | Applications opened March 11, 2026 |
| Citrus | $7,000 | DEP pre-approved focus areas | Full; the county is waiting on more funding |
For Marion, Volusia and Wakulla, ask the county directly.
What qualifies
Seminole County's page lists three approved technologies. They aren't equal once installed:
- In-ground nitrogen-reducing biofilter: no maintenance contract or operating permit needed.
- Nitrogen-reducing aerobic treatment unit (NSF-245 certified): needs a maintenance contract and an operating permit.
- Performance-based treatment system: engineer-designed, and needs a maintenance contract and an operating permit.
How the money moves
It differs. Seminole and Pasco reimburse the homeowner after the work passes inspection. Leon reimburses too, and says the homeowner still pays for the permit application, site evaluation and pump-out. Citrus pays the registered contractor directly once the job is done. In every case, don't start work before the county approves your application. Citrus says plainly that work done before approval isn't eligible.
Why it matters even without a grant
On a lot under one acre inside one of these areas, a repair or modification permit can now require a nitrogen-reducing system anyway. Seminole and Orange both say so. If your conventional system is failing and you're in a focus area, apply for the grant before you pull the repair permit.
Not sure if you're in an eligible area? Each county links an eligibility map from the pages below. A registered contractor who works in your county will also know. Ask up to 3 for a price and pick "Nitrogen-reducing upgrade".
Sources: Florida DEP, Seminole County, Orange County FAQ, Pasco County, Leon County, Hernando County, Citrus County.